A measured, buildable bird-control package for your tender.
Drawing and revision review, bills of quantities, proposed system specifications, access allowances, installation interfaces and written clarifications for commercial tender teams.
Give the QS a defined scope, not an unexplained lump sum.
UKBC reviews the information your team already holds and identifies the elements needed to form a measurable bird proofing work package.
Typical inputs include issued-for-tender drawings, architectural elevations, roof plans, specifications, bird-activity reports, Bills of Quantities and programme milestones. Outputs can include annotated extents, a measurable system schedule, pricing breakdowns, fixing and access assumptions, qualifications and exclusions.
We flag ambiguities early: missing elevation areas, uncertain access, design responsibility, interface with façade and roof warranties, protected wildlife considerations, and the maintenance obligations that affect the system after practical completion.
What your tender return can address
Measured scope
Net areas, perimeter lengths, linear ledges, openings, provisional quantities, drawing references and revision notes.
Specification & compliance
Target species, suitable apertures, material grade, substrate compatibility, interfaces and relevant wildlife constraints.
Access & methodology
MEWP, scaffold, rope access, site inductions, exclusion zones, possessions, rescue arrangements and other contractor interfaces.
Clarifications & exclusions
Tender queries, information gaps, assumptions, design responsibility, variations and dependencies on other trades.
Programme & preliminaries
Availability of areas, sequencing, shift restrictions, access hire, delivery, site protection and relevant lead times.
Handover requirements
As-built records, system data, inspection intervals, O&M manuals and project-specific warranty terms.
Send the package your estimating team already uses.
Submit drawings individually, attach the BoQ and specification, or provide one organised ZIP pack. We can review the tender return date, practical completion target and principal contractor requirements as part of the enquiry.
Submit tender information or request our PQQ pack →From drawings and quantities to an auditable handover.
UKBC brings established bird proofing installation and project-documentation experience to the commercial specification process.
- Review of project drawings, existing system designs and bills of quantities.
- Measured take-offs, system recommendations and documented scope assumptions.
- Coordination of relevant specialist subcontractors, including high level access.
- Quotation detail, installation records, as-built information and O&M manuals.
- Clear inspection, maintenance and system guarantee information where agreed in the contract.
Any guarantee period, exclusions, maintenance obligations and responsible party are confirmed in the project quotation and handover documentation; no blanket guarantee duration is implied.
