Skip to content
UK Bird Control Request a quote
ACCESS MATTERS

Scaffold, MEWP, rope access or coordinated project access: choose the method around the job.

Access strategy affects cost, programme, safety and detailing. UKBC considers it during survey rather than treating it as an afterthought.

ACCESS STRATEGY

Access is part of the specification because it changes the economics of the job.

The cheapest system on paper may become expensive if it needs a full scaffold for every repair. UKBC considers installation and future access when the system is designed.

Scaffold

Useful for broad façade packages, complex installs and integration with wider construction work.

MEWP

Efficient for selected elevations and repeatable linear work where ground conditions allow.

Rope access

Can suit difficult high-level locations where the design and rescue plan support it.

Existing access

Roof walkways, cradles, BMUs and project access can sometimes be integrated into delivery.