Skip to content
UK Bird Control Request a quote
DELIVERY

Commercial installation planned around access, programme and live-site constraints.

Installation packages can be coordinated with principal contractors, facilities teams, managing agents and specialist access requirements.

INSTALLATION

A successful install is the survey translated accurately onto the building.

UKBC installation planning considers sequencing, access, substrate preparation, fixings, neighbouring untreated areas, handover and how the system will be inspected later.

01Review the briefDrawings, photographs, bird activity and existing scope
02Assess & specifySite constraints, quantities, access and system design
03Quote & agreeTransparent scope, assumptions, exclusions and programme
04Coordinate deliveryAppropriate specialist installers and site controls
05Prepare the handoverInstallation records, drawings and O&M information
06Complete & guaranteeFinal checks and the project-specific warranty terms
DELIVERY PRINCIPLES

Buildable details

Fixing and wire/net geometry must be realistic for the actual structure.

Live-site coordination

Work areas, permits, access and segregation are planned around the site.

Handover quality

The final package should be inspectable, maintainable and documented.

UKBC MATERIAL STANDARD

316 marine-grade stainless steel by default.

UKBC specifies stainless-steel proofing systems as the default for long-term external installations. Galvanised alternatives can be considered where a client specification or budget requires them, but lifecycle, corrosion exposure and maintenance expectations should be assessed at survey stage.